- Credit score:
- Reliable
- Reputation score:
- 2,640
- Employees:
- –
- Forecast turnover (2026):
- –
Geodetic research
Building advice, construction expertise, building projects, Cadastral measurements, Project Measurements, Design, Preparation of detailed drawings, detailed plans, building inventory, reconstruction projects
-
design
-
preparation of detailed drawings
-
control surveying of construction works
-
verification of measurement details
-
preparation of measurement protocols
-
the control measurement of the building
-
verification of the measurement details
-
building advice
-
construction expertise
-
building projects
-
cadastral measurements
-
project measurements
-
detailed plans
-
building inventory
-
reconstruction projects
-
construction geodetic services
-
post-construction control measurement
-
digitalisation of building design documentation
-
rebuilding projects
-
technical advice
-
technical supervision
-
construction inspections
-
construction works planning
-
marking work
-
digitalisation of the project
-
assessment of structures
-
analysis of building materials
-
cost analysis of building design documentation
-
construction safety assessment and advice
-
assessment of building safety
- Credit score:
- Reliable
- Reputation score:
- 2,360
- Employees:
- –
- Forecast turnover (2026):
- 100,118 €
Special construction work
preparation of measurement protocols, balancing heating systems, increasing the efficiency of cooling systems, optimisation of ventilation systems, implementation of systems, drafting of project drawings, high quality heating installation, improvement of cooling systems, ventilation systems installation, balancing systems
-
preparation of measurement protocols
-
balancing heating systems
-
optimisation of ventilation systems
-
implementation of systems
-
drafting of project drawings
-
improvement of cooling systems
-
ventilation systems installation
-
increasing the efficiency of cooling systems
-
high quality heating installation
-
balancing systems
-
accurate drawing and execution of systems
-
special construction work
- Credit score:
- Reliable
- Reputation score:
- 2,260
- Employees:
- 1
- Forecast turnover (2026):
- 78,395 €
Geodetic research
construction inspections, preparation of measurement protocols, verification of the measurement details, the control measurement of the building, Measuring, assessment of building safety, cost analysis of building design documentation, analysis of building materials, assessment of structures, planning of construction work
-
digitalisation of the project
-
planning of construction work
-
assessment of structures
-
measuring
-
the control measurement of the building
-
verification of the measurement details
-
preparation of measurement protocols
-
construction expert assessment
-
building advice
-
detailed plans
-
project measurements
-
rebuilding projects
-
marking work
-
technical advice
-
technical supervision
-
construction inspections
-
analysis of building materials
-
cost analysis of building design documentation
-
assessment of building safety
-
geodetic research
- Credit score:
- Reliable
- Reputation score:
- 13,420
- Employees:
- 68
- Forecast turnover (2026):
- 21,220,943 €
Optimised drying and disposal solutions
Comprehensive solutions from production to charging of solid fuels: mapping of processes, optimisation of drying and energy use, and FIFO/FEFO storage. We reduce waste and ensure a homogeneous product quality.
-
control of particle size distribution of chipped wood and dust
-
sampling and analysis protocols
-
measurement and optimisation of the energy use of the drying process
-
mapping of flows in the production process of solid fuels
-
preparation of production work plans and batch timing
-
manufacture of solid fuels from vegetable biomass
-
detection of foreign matter and contaminants
-
standardisation of grading and classification criteria
-
temperature and humidity control of dryers
-
trend analysis and data logging of moisture content
-
drying forecasting and simulation of drying curves
-
management of stockpiles and implementation of fifo/fefo principles for wood chips
-
optimisation of the loading and unloading sequence