Constructions and MEP design - coordinated heating-ventilation and electrical and pipeline systems without surprises
Coordinated design from start-up to end-of-life
The integrated approach of structures and MEP-design ensures that bearing structures and heating-ventilation, electrical and pipeline systems work together both on the design and on the construction site. Precise technical drawings and clear specifications avoid subsequent collisions, reduce the costs of alteration and ensure compliance with the applicable construction requirements.
Who benefits from this?
The service is best served by developers, architects, main contractors, project managers and real estate owners looking for a smooth construction process, cost-effectiveness and unprotected transfer to the construction site. This is particularly valuable for projects with complex buildings and technical networks, where the design and MEP design must be well coordinated.
Principal functions and advantages
l>The process step-by-step
- Preliminary analysis: technical data, requirements and limitations are collected and priorities are identified.
- Coordination meetings: synergies between structures and MEP teams ensure early resolution of problems.
- Technical drawings and specifications: elaborated details, installation instructions and material lists that are ready for use by the construction team.
- Control and review: BIM-visualisation and collision detection
Comments (0)